city
Project Category: Realised
Project cost: 608200000
Project Initiator / Applicant: JSC "SEC" Turkestan"
Place of sale: Prospect named after B. Sattarkhanov, a pedestrian alley named after N. Nazarbayev.
Sources of project financing, the size of the Company's participation: JSC "SEC" Turkestan "no more than 9% of the total share; Partner at least 91% of the total share.
Scale / power, project components: 215 promotional designs
Members: LLP "Success K", JSC "SEC" Turkestan "

Project objective: the Project provides for the installation of 215 advertising structures of a single design sample (within 5 years).

Implementation plan:

Stage 1-installation of 34 advertising structures by the end of 2019 (1 superboard, 12 pedestrian LED flagpoles, 2 pedestrian LED Mupi, 8 structures with Led screens on one side and scrollers on the other side, 11 double-sided scrollers).

Stage 2 - installation of more than 181 advertising structures within 2 years.

Percentage of parties:

The total cost of the project is 608.2 million tenge.

The company – 9% (nominal contribution in the form of land plots).

Investor-partner-91% (financing, material and technical base).

The company, as its contribution to joint activities, receives land plots from the local Executive body for the creation of tourist advertising and information infrastructure in Turkestan and transfers to the authorized capital of the joint venture established between the Company and Success K LLP – Yassi Media LLP. The investor partner provides financing for the development of project documentation and construction on the land plot at its own expense, including the construction and implementation of infrastructure.

Expected result:

  • creating a new image of advertising structures in accordance with the standards of the General concept of development and design of the city;
  • information notice for visitors, tourists and residents of the city.

Current situation:

In order to implement the investment project, 65 potential sites in Turkestan were identified. It also received a resolution of the mayor's office of Turkestan on the provision of land plots for the implementation of this project (resolution No. 1761 of November 29, 2019, No. 1800 of December 09, 2019).

CURRENT STATE: STAGE 1 has been COMPLETED: 34 advertising structures have been installed:

1 superboard, 12 pedestrian LED flagpoles, 2 pedestrian LED Mupi, 8 designs with Led screens on one side and scrollers on the other side, 11 double-sided scrollers.

PLANS:

Stage 2 - installation of more than 181 advertising structures within 2 years.