city
Project Category: Planned
Project cost: 923300000
Implementation period: 2020-2022
Place of sale: Turkestan region, Shaga
Project Area: 710 ha

The volume of investments of «Ordabasy Kus» LLP: 268 500 000 tenge

Financial assistance: 130 000 000 tenge

The volume of investments of SEC «Turkestan»: 258 500 000 tenge

Loan of SEC «Turkestan»: 266 300 000 tenge

 

Project objective: To expand the use of sprinkler irrigation systems on an area of 700 hectares by installing modern irrigation systems
Project objectives: To increase the volume of agricultural production due to the development of advanced technologies for growing crops.
Current status:

• Construction and installation works have been completed (tracing has been carried out, pumping stations have been installed);
• installed 8 units of sprinklers (manufactured in Austria, company - BAUER Group);
• electricity supply was supplied and a transformer was installed (at the expense of budgetary funds within the framework of the DKB - 2025)
• employees of KazNII ZIR LLP analyzed the soil of a land mass of 700 hectares;
• with the participation of scientific staff of KazNII ZiR LLP, a technological map of sowing and harvesting works for 2020/2021 is being developed;
• spring field work has been completed (winter wheat - 166.8 ha, alfalfa - 180 ha);
• winter wheat harvesting has been completed.

 

Planned:

  • Alfalfa sowing 363 ha
  • Transplanting 180 hectares of alfalfa by the arych method