- Name of the project: Expanding the use of sprinkler irrigation systems on an area of 462.8 hectares by installing modern irrigation systems
- Project cost: 951.3 million.tenge
Project purpose: Expanding the use of sprinkler irrigation systems on an area of 710 hectares by installing modern irrigation systems.
Project objectives: Increasing the volume of agricultural production due to the development of advanced technologies for growing crops.
Current status:
- SMR (laying of cables and pipes) is being carried out, the site is being leveled (uprooting of trees, filling of irrigation ditches);
- a direct contract was signed with the manufacturer "BAUER Group" (Austria) for the supply of 8 units of sprinklers;
- A PSD has been developed for the supply of an electricity supply line and the installation of a transformer (at the expense of budgetary funds within the framework of the DCB - 2025);
- employees of KazNII ZIR LLP conducted an analysis of the soil of a land mass with an area of 710 hectares;
- with the participation of scientific staff of KazNII ZiR LLP, a technological map of sowing and harvesting works for 2020/2021 is being developed;
- it is planned to introduce herbicides aimed at combating reeds and weeds.